Back to Packages

Click here to download the prequalification form

Package # SG-0243
Contracts/Civil, Structural, Architectural
Bid Closing Date November 12, 2015
Title Nickel EW Bay 3 and 4 Construction EOI Posting Date August 25, 2015
RFP Issue Date October 1, 2015 EOI Closing Date ** CLOSED **
Status Awarded Last Revised On May 26, 2016
Successful Bidder DFB Driver Inc.

Contract Scope

Vale Newfoundland & Labrador Limited (Vale NL) are inviting submissions of an Expression of Interest for a potential opportunity to support the Long Harbour Processing Plant in Long Harbour, NL.The scope of work for this package includes the supply of all construction installation personnel, equipment, services and consumable materials to complete the safe construction of all the Structural, Architectural, Mechanical, Piping, Electrical and Instrumentation works for the Nickel EW Building, Bays 3 and 4. Some systems are partially installed while others require a complete installation. The majority of the building steel is in place though some installation of equipment support structures, hand rail, and grating is required. Some Piping and electrical work is done but a substantial amount has to be completed. Very little instrumentation work has been done. Most equipment and materials will be free issued by Vale for installation up to mechanical completion and handover of turnover packages by system and sub-system. Thereafter, the contractor will provide support services to the Vale commissioning and start up team.The main preliminary quantities for installation are:Mechanical Equipment, no motors:253 Pieces, (96 Not Installed, 157 Partially Installed).Process Piping:6500 m pipe (2000m metallic, 4500 non-metallic).Instruments and Junction Box:Control Cable:Structural Steel:FRP members including grating:Concrete on steel deck: When replying to this EOI, please reply to '>mailto:VNLProcurement@Vale.com"> Please state the name of your company, company address & contact details (Name, Phone#, Fax# & E-Mail Address). Please make reference to this specific EOI Package# and Package Description. In addition, please fill in a completed pre-qualification form with each package. This EOI does not constitute an official solicitation. Vale NL reserves the right to cancel this requirement at any time during the EOI and/or solicitation process. Once objective evaluations are completed, only prospective vendors deemed qualified will be contacted.