Package # | SC-MIN-13-344 | QBE Nomination Closing Date | July 19, 2013 | ||
Title | PIPING PROJECTS AND INSTALLATION | Tender Issue Date | July 24, 2013 | ||
Bid Closing Date | August 5, 2013 | ||||
|
Contract Scope
The contractor shall provide general pipefitting services that include repair, modification, and new installation of pipelines throughout the concentrator and the site.
1.1.1. The Company reserves the right to add, remove, and modify the specific scope of work as required. However, anticipated specific projects include, but is not limited to, the following projects:
1.1.1.1. Installation of 12” steel and 10” rubber lined steel lamella clarifier bypass line.
1.1.1.2. Replacement of middlings thickener overflow discharge rubber lined steel pipe with CPVC pipe.
1.1.1.3. Replacement in kind of 16” rubber lined steel fittings in the cyclone feed pump discharge line.
1.1.1.4. Piping modifications to scavenger cleaner scavenger flotation concentrate line.
1.1.1.5. Modifications to concentrate thickener flocculent addition lines.
1.1.1.6. Installation of fuel meters to diesel generator #4.
1.1.1.7. Replacement in kind of 6” rubber lined steel scavenger tails discharge line
1.1.1.8. Replacement of 3” HDPE sampler system return lines.