Contract Scope

1.1.    schedule:

2.1.1.         Work Start: OCT 01 – 2019 Subject to change

      1. Work Complete: SEPT 30 -2022 Subject to change

         

3.       Scope

    1. Detailed Scope of Work to be performed by the Contractor shall include the following:

      1. Perform QA/QC on application of JP-C-660 coating on the below flotation cells. Application of product to be completed by others.

      2. Inspect condition of cell surface prior to coating application to ensure surface preparation is in accordance with manufactures requirements.

      3. Provide monitoring of steel profile, relative humidity, air temperature, steel temperature and finished polyurea gauge thickness.

      4. Report any findings or conditions not in accordance with manufactures guidelines immediately to owner and applicator for resolutions.

      5. Contractor to provide testing equipment required to complete the QA/QC inspection.

      1. List of flotation cells are as follows. Dates are subject to change:

         

  • Scavenger Cell #5 (October 2019)

  • New Scav Cleaner Cells 7,8,9 (October 2019)

  • New Scav Cleaner Cells 1-6  (2020)

  • Cu/Ni Separator Cells 1-9 (2020)

  • Cu Scavenger Cells 1-6 (2021)

     

      1. Manufacturer of coating and recommended provider of the QA/QC service:

                    ITW ENGINEERED POLYMERS

                    2425N – LAPOUR ROAD