Back to Contracts

Click here to download the prequalification form

Contract # PE0010
Goods/General
Title Combined Heat & Powew Plants EOI Posting Date August 5, 2016
RFP Issue Date May 16, 2018 EOI Closing Date ** CLOSED **
Status Open Last Revised On September 19, 2018

Contract Scope

<p>The scope of work includes the design, fabrication, shop testing, supply and shall be complete including all materials and required hardware necessary to complete the assembly and commissioning of diesel generators and ancillary equipment required to support the expansion of the mine. Total new capacity requirements shall be approximately 29 MWe with generators operating at approximately 85% load and forming an N+2 power plant when combined with the existing power plant. Ancillary equipment includes, but is not limited to, cooling and exhaust gas heat recovery, heat exchangers, silencers, stacks, starting air compressors, receivers, switch gear, transformers, local engine control panels, unit control panels and supervisory control system.  A detailed custom engineering documentation package is required to enable Vale to complete the balance of the plant design.  Excludes foundations and buried services. </p>


Notes:

(1) When replying to this EOI, please reply to VBUG.Procurement@Vale.com. Please state the name of your company, company address & contact details (Name, Phone#, Fax# & E-Mail Address). Please make reference to this specific EOI Package# and Package Description. In addition, please fill in a completed pre-qualification form with each package.

(2) This EOI does not constitute an official solicitation. Vale NL reserves the right to cancel this requirement at any time during the EOI and/or solicitation process. Once objective evaluations are completed, only prospective vendors deemed qualified will be contacted.